project info

The GPT Group | 580 George St, Sydney.

Service Type

Lift Lobby UpgradeSpeculative Suite

Scope Projects delivered this full floor workplace upgrade for The GPT Group in collaboration with Turner & Townsend and Greenbox Architecture. With the existing tenant giving back one floor, the project brief was to remove an internal staircase between the two floors creating two separate suites, including a new spec suite on level 13. 

The existing structural steel staircase removal provided one of the key project challenges, with the team achieving the notable feat of demolishing and removing this within just three days, with the added pressure of being completed over the festive period.  The spec suite design scope included a new front of house reception and waiting area, plus board and meeting rooms. With a bright and open layout, plants were also placed throughout to soften and create a biophilic design-like look and feel.   

view all
Projects.